The number of plants belonging to TELAT at 31 December 2010, and 31 December 2009, is shown in the following table

  TELAT
31 Dec. 2010 31 Dec. 2009 Change
Stations no. 19 - + no. 19
Transformers no. 2
320 MVA
-
-
+ no. 2
+320 MVA
Bays no. 119 - + no. 119
Lines 16,833 km 16,872 km -39 km
3-phase power lines no. 1,734
17,871 km
no. 1,724
17,943 km
+ no. 10
-72 km

Stations and transformers

In relation to stations and transformers, the changes recorded are all ascribable to the assets achieved with the merger of the Brescia Transmission Network.

Long distance power lines
As of 31 December 2010, the extent of the lines and three-phase lines derives basically from the combined effect of the ollowing factors:

  • 32 lines for a total of 381.0 km concerned by the above sale to Terna;
  • 25 lines for a total of 287.9 km acquired with the merger of Brescia Transmission Network;
  • 2 lines acquired by Enel Distribuzione for a total of 72.8 km;
  • 8 new lines activated for a total of 41.2 km: Baronissi - Mercatello 150 kV (6.3 km), Aversa - Aversa RFI 150 kV (2.2 km), Gricignano - Aversa RFI 150 kV (6.5 km), Torre Nord - Torre Sud 60 kV (3.7 km), Mulini - Quattroventi 150 kV (4.8 km), Siracusa Nord - Siracusa Est 150 kV (6.6 km), cp Monselice - cp Este Nuova 132 kV (9.9 km), Fano Z.I. - Profilglass 132 kV (1.2 km).